About the project

The client desired an access road from the main artery road up to the container terminal, which is a distance of approximately 1.8 kilometres (about 1 mile). The subgrade of the road pavement was highly plastic and comprised of weak clayey soil.

Strata’s engineers suggested an innovative solution, using StrataWeb® geocells – a cost-effective, technically sound, and permanent solution for busy, heavy-duty access roads. The system incorporated StrataWeb® within the pavement section to reduce the bearing pressures onto the subsoil. This offered a leaner pavement cross-section that reduced material requirements by incorporating StrataWeb® facilitating speedy construction.

The design was for strengthening the pavement with a single layer of StrataWeb® geocells SW356-150 in-filled and topped with 150 mm of granular sub-base. 20,000 sqm. of StrataWeb® were used. StrataGrid™ was included in the pavement section to mobilize resistance to traction forces generated by vehicular movement.

The out-of-the-box solution resulted in an economical, fast and smooth construction process that ensured that bearing pressure was within safe limits.

Technical drawing

CONSULTATION

From know-how to manufacture, installation
and support

Strata not only provides geotechnical products, but our team of 200+ engineers can help you with your turnkey project by supplying you with technical knowhow and support as to how our products can help you finish your projects in time while keeping costs down.

Send us your queries and we will get back to you with our expertise.

MORE SUCCESS STORIES

Strata Geosystems uses eco-friendly solution with geogrid at KuberTila, Ram Mandir

The Kuber Tila project, located in Ram Mandir, Ayodhya is a small hillock within the temple grounds. It underpins the Ram Van Gaman path – symbolising the journey of Lord Ram from Ayodhya to Lanka. The engineering team identified the need for slope retention.

Construction of StrataWeb® Geocell Wall 32m high RS wall in the state of Manipur

This project encompasses a total length of 111 kilometers, posing the challenge of limited Right of Way (ROW) availability on either side of the proposed road’s centerline. To address this constraint, there was a need to stabilise steep slopes, manage deep cuttings, or contain filled soil within the ROW.
A total of 34 locations were identified as critical areas with deep filling requirements

Building of RS Wall Along 42KM Highway

Strata undertook a significant project involving the design and construction of Reinforced Soil (RS) wall approaches along the NH-363 highway, spanning a 42-kilometer stretch from Mancherial to Repallewada in Telangana.

The client’s primary requirement was to find a cost-effective and efficient alternative to the conventional approach of using Reinforced.. 

Need a consultation? We’re at your service.

Tell us a little about yourself and what you’re looking for, and our experts will get back to you with a perfect solution!

Need a consultation? We’re at your service.

Tell us a little about yourself and what you’re looking for, and our experts will get back to you with a perfect solution!

Harold W. Hill, Jr

Director, President – Glen Raven Technical Fabrics

Strata/Glen Raven tenure: 10 years/28 years
Total industry experience: 35 years


MBA – Wake Forest University

 

Directs the strategic direction of Glen Raven’s automotive, protective apparel, military, geogrid, outdoor and logistic businesses.

J. Craig Bell

Director, General Manager, Strata Inc.

Strata/Strata Inc. tenure: 3 years/14 years
Total industry experience: 25 years


MBA – Georgia State University

 

Led the integration of Strata Inc. business operations into the headquarters of GRTF and transition from USA based to India based manufacturing.

Ashok Bhawnani

Director

Strata tenure: 17 years
Total industry experience: 47 years

CA – ICA

 

Played a key role in the establishment of Strata’s India operations. Provides vision for product innovation and leveraging new technology trends.

Phil McGoldrick

Global Technical Sales Director

Strata tenure: 7 years
Total industry experience: 32 years


Civil & Geotechnical Engineer (First class)


Provides highly technical and innovative civil engineering solutions in India and around the world. Responsible for the design and execution of large-scale geotechnical projects around the world including Australia, Asia, Europe, Africa, Middle East, and South America.

Shahrokh Bagli

CTO – Chief Technology Officer

Strata tenure: 9 years
Total industry experience: 48 years


BTech (Hons), MTech (Civil) Both IIT Bombay, DMS (Bombay University), FIE, FIGS, Chartered Engineer

 

Streamlines the designs of Geosynthetics and has brought innovation in geogrid and geocell design application.

Mujib Katrawala

COO – Projects and Sales

Strata tenure: 13 years
Total industry experience: 24 years


MBA – University of Gujarat

 

Leads the monetization of products and solutions while ensuring highest execution quality and project profitability.

Chandrashekhar Kanade

COO – Technical Textiles

Strata tenure: 13 years
Total industry experience: 33 years


BE (Mechanical) – Nagpur University

 

Drives excellence in process design, product features and cost effectiveness in production.

Govind Keswani

CFO – Chief Financial Officer

Strata tenure: 8 years
Total industry experience: 35 years


CA – ICA, ICWA – ICWAI

 

Leads the finance, accounting, taxation, commercial, legal and IT functions and assisting on all strategic and operational matters.

Gautam Dalmia

CDO – Chief Development Officer

Strata tenure: 10 years
Total industry experience: 13 years


MBA – ISB, Hyderabad

 

Leads diversification of the product portfolio, monetizing the new products and ensuring successful sustained financial growth of the company top line.

Narendra Dalmia

CEO – Chief Executive Officer

Strata tenure: 14 years
Total industry experience: 42 years


B Tech (Chemical) – IIT Delhi

 

Leads day-to-day business operations of the company with focus on capacity expansion, product and process improvement.


Fatal error: Uncaught Error: Class "ALInfo" not found in /var/www/vhosts/strataglobal.com/httpdocs/wp-content/plugins/airlift/buffer/cache.php:254 Stack trace: #0 [internal function]: ALCache->optimizePageAndSaveCache() #1 /var/www/vhosts/strataglobal.com/httpdocs/wp-includes/functions.php(5464): ob_end_flush() #2 /var/www/vhosts/strataglobal.com/httpdocs/wp-includes/class-wp-hook.php(324): wp_ob_end_flush_all() #3 /var/www/vhosts/strataglobal.com/httpdocs/wp-includes/class-wp-hook.php(348): WP_Hook->apply_filters() #4 /var/www/vhosts/strataglobal.com/httpdocs/wp-includes/plugin.php(517): WP_Hook->do_action() #5 /var/www/vhosts/strataglobal.com/httpdocs/wp-includes/load.php(1279): do_action() #6 [internal function]: shutdown_action_hook() #7 {main} thrown in /var/www/vhosts/strataglobal.com/httpdocs/wp-content/plugins/airlift/buffer/cache.php on line 254